July 24, 2020

Pastor Brown swings the first hammer to kick off demolition and the construction on the Women's and Children's Shelter

August 25, 2020

The Fence is put up around the construction site and one of the lanes on Burdick St is closed.

August 26, 2020

Excavating equipment arrives to the construction site

September 16, 2020

The first bricks begin to fall as the first part of the building comes down.

September 18, 2020

The demolition crew tear down the first of the three buildings on Burdick St.

September 21, 2020

Demolition on the 2nd building begins.

September 22, 2020

The construction crew finishes tearing down the second building and moves onto the third and final building

October 9, 2020

Demolition is completed on the third and final building. The demolition crew continues to remove debris, clearing the way for the new foundation to be poured

November 30, 2020

The old basements are cleared out and filled in with dirt. Construction crews create molds for the new foundation to be poured.

January 22, 2021

The first delivery of steel arrives on Friday. Construction crews will begin the steel frame assembly in the next couple of weeks!

February 10th, 2021

The building begins to take shape as the steam beams are lifted into place.

March 3rd, 2021

With the steel frame in place, work begins on the exterior walls.

March 18, 2021

Work continues on the elevator frame and plumbing begins as the first pipes are laid into the Ground.

March 10, 2021

The first interior walls go up and the exterior brick veneer begins on the east side of the building.

April 5, 2021

After the first floor concrete was poured, work began on the walls for the first floor.

July 15, 2021

The exterior bricks begin to line the walls and the room starts to take shape

July 30, 2021

August 15, 2021

September 24, 2021